Sign In | Join Free | My howtoaddlikebutton.com |
|
Brand Name : JRace
Model Number : RTS
Certification : IAAF ,SGS,ISO9001,ISO14001
Place of Origin : China Mainland
MOQ : 100sqm
Price : Negotiable
Payment Terms : T/T
Supply Ability : 50000 Ton Per Year
Delivery Time : 5 Days After Payment
Packaging Details : Barrels package
Color : Red,Blue And Others
Material : PU Resin
Thickness : 13mm
Guarantee : 6-8years
Product : PU athletic tartan track
Usage : Rubber Running Track Surface
Elongation at Break : 150%
Overseas installation : available
Samples : available
Sandwich Spray Coat Full PU Synthetic Rubber Jogging Running Track Surface
1. Polyurethane System Material For Athletic Running Track Project (IAAF certificated Spray-coat , Sandwich, Full-PU System).
2. We are manufacture with two factories produce Synthetic Sports Track & Field installation Polyurethane material .
Bellow is my spray track details :
Spray track Structure:103#Primer+ SBR layer+ pu top coat with EPDM + marking paint
Color:red, green or blue
Usage: School ,Stadium athletic running track
Thickness:13 mm
Main material: No 103 special glue primer,SBR,EPDM,pu top coat material
Auxiliary material:pu binder resin,hardener
Base:concrete base,asphalt base
demand of base:cement concrete/ asphalt concrete
Lifespan:6-10years
All Weather Use Permeable Athletic Rubber Running Track/ Race Track
We are a highly credited international manufacturer and contractor of Synthetic Sports Track & Field installation Polyurethane material,
All Project’s products are manufactured to meet the highest industry standards .
We hope you will find what your looking for and if the products are of interest to your company we would like the opportunity to do business with you.
2. Excellent wear resistance,can ensure the long-term stability of pavement structure with proper drainage slope available On asphalt /concrete base
Thickness(mm) | 13 |
Force Reduction % | 36.0 |
Vertical Deformation mm | 1.30 |
Skid Resistance BPN20°C | 53 |
Tensile strength MPa | 0.56 |
Elongation at Break % | 51.7 |
Flame Retardance | 1 |
Test Conclusion | Pass GB/T22517.6-2011;GB/T14833-2011 |
Factory and company
3. Packaging & Shipping
![]() |
Sandwich Spray Coat Synthetic Athletic Track Surface , Prefabricated Rubber Running Track Images |