Sign In | Join Free | My howtoaddlikebutton.com |
|
Brand Name : Green Grass
Model Number : CD 001 / CD101 / CD102 / CD 002
Certification : ITF 5
Place of Origin : GuangDong China
MOQ : 100sqm
Price : Negotiable
Payment Terms : T/T, L/C
Supply Ability : 50000 Tons / Per Year
Delivery Time : 7 Days after deposit
Packaging Details : Barrel
Material : Silicon PU
Thickness : 3-8mm
Color : Dark Red / Jade Green / Olympic Blue / Bright Red
Surface Hardness ( Shore A ) : 36
Ball Rebounce : 99.10%
Gloss : Pass
TDI.HDI : Not Detected
UV Test Under 168h : 3.2MPA
Friction : 105
Flexibility At Low Temperature : No Crack
Shock-Absorption Spu Basketball court Material Sport Court Coating
1. Concrete requirements
1) Compactness: Refer to the concrete building strength standard (C25 /4000PSI)
2) Flatness: Using 3m ruler to measure, the error is not more than 3mm.
3) Slop: Ensure the drainage,Horizontal slop is not more than 5‰, Vertical slop is not more than 3‰.
4) Maintenance: The new concrete should maintain no less than 28days, the first 7days should pour water conservation.
5) Crack: the new concrete must cut after pouring water conservation, each part size should be 6X8m. the crack width should be 6~8mm,the depth is not less than 30m
Note: It suggest to build the new concrete ,in case of the old concrete sink ,deformation,or crack too much. the new concrete thickness should be ≥ 80mm.
2.Concrete base processing
1) Cut : The normal crack in right-angle, please cut it in V shape with width in 40- 50mm,the depth in 20mm
2) Wash: Polish the convex and the loose. Clean the floor by water and dilute hydrochloric acid
(concentration: 5~8%) ; Before the next step, ensure there is no dilute hydrochloric acid and the floor is dry.
Note: Marking down the ponding when cleaning, Some projects clean only by water.
If possible, we suggest to polish the base .
3) Primer : Before primer, the concrete base must be totally dry.
Feature: in order to seal the concrete hole, then after buffer coat, it is not easy to delaminating and bubble.
Mixture: open the drum and apply directly, mix nothing.
Tool: Roller brush
4) Caulk : ( After the primer dry, then caulk. )
Tool: Trowel
Buffer coat mixture: 1kg buffer coat (Label: CD002) +0.05—0.1kg water.
Crack ller mixture: 1 kg crack ller (Label: CD201) +0.02—0.05kg water.
![]() |
Professional SPU Sport Court Flooring Shock Absorption For Games Area Images |