Sign In | Join Free | My howtoaddlikebutton.com |
|
Brand Name : JRace
Model Number : JRace
Certification : IAAF, ISO
Place of Origin : China
MOQ : 500 Square meters
Price : USD10-20 per square meter
Payment Terms : L/C, T/T
Supply Ability : 50000 Ton per year
Delivery Time : 10 days after advance payment
Packaging Details : Packed in barrel
Material : PU
Thickness : 13MM
Surface Color : Red or customized
Installation time : About 40days
Environment : Our goods do not harm to environment
IAAF Certificated 13mm Thickness Polyurethane Track Surface With Red Color
1.good quality athletics tracks surfaces
2.Thickness: 13-15mm running track
3.green product, factory price
4.IAAF Certification
Product Description
Appropriate elasticity, good shock absorption
Use environmentally-friendly materials, the specifications of the courts suitable for long-term trainning and competition.
Good anti-aging,wearing resistance and weather resistance.
Product Performance
Material Name | Item | Group A | Group B |
1:4 PU primer | Color | transparent/light yellow color liquid | red color liquid |
Viscosity(25℃,mpa s) | 500-1500 | 15000--22000 | |
Solid Content(%) | ≥99 | ≥99 | |
Mixture | Group A:GroupB:Hardener=1:4:0.04--0.08 | ||
Pot life(25℃, min) | ≥60 | ||
Surface dry time(25℃,h) | ≤8 | ||
the whole system dry time(25℃,h) | ≤16 | ||
Hardness JIS A | 45-50 | ||
Tensile strength(Mpa) | ≥1.5 | ||
Elongation at break | ≥150 | ||
Flammability | Bf1-S | ||
1:2 PU top coat | Color | transparent/light yellow color liquid | red color liquid |
Viscosity(25℃,mpa s) | 500-1500 | 15000--22000 | |
Solid Content(%) | ≥99 | ≥99 | |
Mixture | Group A:GroupB:Hardener=1:2:0--0.02 | ||
Pot life(25℃, min) | ≥60 | ||
Surface dry time(25℃,h) | ≤4 | ||
the whole system dry time(25℃,h) | ≤8 | ||
Hardness JIS A | 50-70 | ||
Tensile strength(Mpa) | ≥3 | ||
Elongation at break | ≥250 | ||
Flammability | Bf1-S |
Part of cases
Product Package
Item | Specification |
No.103 Glue Binder | 20kg/200kg/barrel |
EPDM | 25kg/bag |
SBR Granule | 25kg/bag |
Top Coat A | 15kg/200kg/barrel |
Top Coat B | 30kg/300kg/barrel |
FAQ
Q:What is the Production time?
A:It is about 10 days.
Q:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.
Q:What is the life Span for Running track?
A:The life span is about 10years.
Q:I am Interested in Synthetic track surface,what is the best choice?
A: Running track surfaces are produced on site with combinations of either latex or polyurethane binder and rubber. Best choice of surface will take into account use, performance requirepemtns, budget, and life cycle costs. Except for the full solid pour systems which vary in depth, The standard colors are trakc red and black although other colors are available at additional cost. Spray Coating is a porous system consisting of a paved base mat of binder and black rubber with 2 structural spray coats to pvovide wear and UV protection. Running track sandwich System with the paved base mat covered by top layer of solid-pour polyurethane and rubber.
![]() |
Environmentally - Friendly Polyurethane Track Surface Red Or Customized Images |